Use 3 Guangzhou CNC RMD08 four-axis robots, cooperate with two punches and automatic feeders;
Requires 7 seconds to punch a piece;
The robot must cooperate with the punch to stably load and unload for a long time.
solution
Develop automated processes based on customer parts;
Recommend reliable and suitable workpiece fixtures;
Each process is debugged to meet design requirements;
Multi-process can continuously run normal batch production;
After mass production, stamped parts can meet customer requirements.
GSK
Application effect
With the feeding rack and robot, the stamping time is 6.5 seconds / piece.
|